Minimalist and zero-dependency scheduling library for Go
Minimalist and zero-dependency scheduling library for Go
A minimalistic and zero-dependency scheduling library for Go.
The implementation is inspired by the design of the Quartz Java scheduler.
The core scheduler component can be used to manage scheduled jobs (tasks) using triggers. The implementation of the cron trigger fully supports the Quartz cron expression format and can be used independently to calculate a future time given the previous execution time.
If you need to run multiple instances of the scheduler, see the distributed mode section for guidance.
…Implemented Schedulers
type Trigger interface {
// NextFireTime returns the next time at which the Trigger is scheduled to fire.
NextFireTime(prev int64) (int64, error)
// Description returns the description of the Trigger.
Description() string
}Implemented Triggers
Any type that implements it can be scheduled.
type Job interface {
// Execute is called by a Scheduler when the Trigger associated with this job fires.
Execute(context.Context) error
// Description returns the description of the Job.
Description() string
}Several common Job implementations can be found in the job package.
| Field Name | Mandatory | Allowed Values | Allowed Special Characters |
|---|---|---|---|
| Seconds | YES | 0-59 | , - * / |
| Minutes | YES | 0-59 | , - * / |
| Hours | YES | 0-23 | , - * / |
| Day of month | YES | 1-31 | , - * ? / L W |
| Month | YES | 1-12 or JAN-DEC | , - * / |
| Day of week | YES | 1-7 or SUN-SAT | , - * ? / L # |
| Year | NO | empty, 1970- | , - * / |
*: All values in a field (e.g., * in minutes = "every minute").?: No specific value; use when specifying one of two related fields (e.g., "10" in day-of- month, ? in
day-of-week).-: Range of values (e.g., 10-12 in hour = "hours 10, 11, and 12").,: List of values (e.g., MON,WED,FRI in day-of-week = "Monday, Wednesday, Friday")./: Increments (e.g., 0/15 in seconds = "0, 15, 30, 45"; 1/3 in day-of-month = "every 3 days from the 1st").L: Last day; meaning varies by field. Ranges or lists are not allowed with L.L-3 is the third to last day of the month).6L = "last Friday").W: Nearest weekday in the month to the given day (e.g., 15W = "nearest weekday to the 15th"). If 1W on
Saturday, it fires Monday the 3rd. W only applies to a single day, not ranges or lists.#: Nth weekday of the month (e.g., 6#3 = "third Friday"; 2#1 = "first Monday"). Firing does not occur if
that nth weekday does not exist in the month.1 The L and W characters can also be combined in the day-of-month field to yield LW, which
translates to "last weekday of the month".
2 The names of months and days of the week are not case-sensitive. MON is the same as mon.
The scheduler can use its own implementation of quartz.JobQueue to allow state sharing.
An example implementation of the job queue using the file system as a persistence layer
can be found here.
…See the examples directory for additional code samples.
Licensed under the MIT License.
No open issues yet, or sync has not completed.